Oz Choppers is a commercial helicopter refurbishment business that wanted to reduce their energy costs in the business and make a positive environmental difference.

Project: Commercial

Location: MUDGEE

Connection: On-Grid

Array Size: 30kW

Avg. Daily Production: 145kW

SPS conducted a comprehensive assessment of OC consumption over a 14 day period prior to presenting a solution to Oz Choppers.

The final project consisted of 2 x 15 kW grid connected solar systems on workshop roof area, to ensure compatibility with two 3 phase metering points within the main workshop and spray booth shed. 120 PV modules coupled with 2 x SMA STP 15kW 3 phase inverters.

This installation provides an average daily power production of 146 kWh.

Kate Rogers said:

From when we first contacted them, SPS Solar were very professional, Steve came and saw us, gave us a very detailed explanation of what he would do starting with the [site analysis] datalogging. After processing, he supplied a spreadsheet with clear costs and analysis, how long it would take and what the process would be. We were very well informed all the way along and it was all done very professionally.